| 000 | 00748cam a2200241u 4500 | ||
|---|---|---|---|
| 001 | 9834156 | ||
| 003 | BD-DhUL | ||
| 005 | 20150103180000.0 | ||
| 008 | 820922s1960 enka 000 0 eng | ||
| 010 | _a 60052113 | ||
| 040 |
_aDLC _cCarP _dDLC _dBD-DhUL |
||
| 050 | 0 | 0 |
_aTS205 _b.T48 |
| 082 |
_a671 _bTHH |
||
| 100 | 1 | _aThompson, Alan George. | |
| 245 | 1 | 0 |
_aHigh productivity in heavy engineering : _bproduction, inspection, and cost control in welded fabrication / |
| 260 |
_aLondon : _bIliffe, _cc1960. |
||
| 300 |
_aviii, 339 p. : _bills. ; _c22 cm. |
||
| 504 | _aInclude index and bibliographical references. | ||
| 650 | 0 | _aMetal-work. | |
| 650 | 0 | _aWelding. | |
| 906 |
_a0 _bcbc _cpremunv _du _encip _f19 _gy-gencatlg |
||
| 942 |
_2ddc _cBK |
||
| 999 |
_c27093 _d27093 |
||