| 000 | 00837cam a22002771 4500 | ||
|---|---|---|---|
| 001 | 7495671 | ||
| 003 | BD-DhUL | ||
| 005 | 20161222101255.0 | ||
| 008 | 751015s1961 njua b 000 0 eng | ||
| 010 | _a 61011359 | ||
| 015 | _aGB61-22592 | ||
| 035 | _a(OCoLC)1705024 | ||
| 040 |
_aDLC _cFMU _dBD-DhUL |
||
| 042 | _apremarc | ||
| 050 | 0 | 0 |
_aHD69.P7 _bT6 |
| 082 |
_a658.533 _bTOH |
||
| 100 | 1 | _aTonge, Fred M. | |
| 245 | 1 | 2 |
_aA heuristic program for assembly line balancing / _c Fred M. Tonge. |
| 260 |
_aEnglewood Cliffs, N.J. : _bPrentice-Hall, _c1961. |
||
| 300 |
_axi, 115 p. : _billus.; _c24 cm. |
||
| 410 | 2 | 0 |
_aFord Foundation. _tDoctoral dissertation series |
| 502 | _aThesis--Carnegie Institute of Technology. | ||
| 504 | _aBibliography: p. 113-115. | ||
| 650 | 0 | _aLine of balance (Management) | |
| 942 |
_2ddc _cBK |
||
| 999 |
_c140558 _d140558 |
||