| 000 | 00840cam a22002771 4500 | ||
|---|---|---|---|
| 001 | 8948537 | ||
| 003 | BD-DhUL | ||
| 005 | 20161222100940.0 | ||
| 008 | 720307s1967 maua b 000 0 eng | ||
| 010 | _a 67021296 | ||
| 015 | _aGB68-4039 | ||
| 035 | _a(OCoLC)256358 | ||
| 040 |
_aDLC _cODaWU _dBD-DhUL |
||
| 042 | _apremarc | ||
| 050 | 0 | 0 |
_aTS155 _b.C637 |
| 082 |
_a658.53 _bCOT |
||
| 100 | 1 |
_aConway, Richard Walter, _d1931- |
|
| 245 | 1 | 0 |
_aTheory of scheduling / _c Richard W. Conway, William L. Maxwell [and] Louis W. Miller. |
| 260 |
_aReading, Mass. : _bAddison-Wesley Pub. Co. _c1967. |
||
| 300 |
_ax, 294 p. : _billus.; _c24 cm. |
||
| 504 | _aBibliography: p. 249-258. | ||
| 650 | 0 | _aProduction scheduling. | |
| 700 | 1 |
_aMaxwell, William L., _d1934- |
|
| 700 | 1 |
_aMiller, L. W. _q(Louis W.), _d1935- |
|
| 942 |
_2ddc _cBK |
||
| 999 |
_c140553 _d140553 |
||