| 000 | 01180cam a2200289 a 4500 | ||
|---|---|---|---|
| 001 | 1162560 | ||
| 003 | BD-DhUL | ||
| 005 | 20161212114610.0 | ||
| 008 | 960510s1996 dcua b 000 0 eng | ||
| 010 | _a 96022845 | ||
| 020 | _a0821336703 | ||
| 040 |
_aDLC _cDLC _dDLC _dBD-DhUL |
||
| 082 |
_a621.3121 _bBAE |
||
| 100 | 1 |
_aBacon, Robert, _d1942- |
|
| 245 | 1 | 0 |
_aEstimating construction costs and schedules : _bexperience with power generation projects in developing countries / _cRobert W. Bacon, John E. Besant-Jones, and Jamshid Heidarian. |
| 260 |
_aWashington, D.C. : _bWorld Bank, _cc1996. |
||
| 300 |
_axv, 120 p. : _bill. ; _c28 cm. |
||
| 490 | 1 |
_aWorld Bank technical paper, _x0253-7494 ; _vno. 325. _aEnergy series |
|
| 504 | _aIncludes bibliographical references (p. 119-120). | ||
| 650 | 0 |
_aElectric power-plants _xDesign and construction _xEstimates _zDeveloping countries. |
|
| 650 | 0 |
_aElectric power-plants _zDeveloping countries _xCosts _xStatistics. |
|
| 700 | 2 |
_aBesant-Jones, John, _d1941- |
|
| 700 | 1 | _aHeidarian, Jamshid. | |
| 830 | 0 |
_aWorld Bank technical paper ; _vno. 325. |
|
| 830 | 0 |
_aWorld Bank technical paper. _pEnergy series. |
|
| 942 |
_2ddc _cBK |
||
| 999 |
_c134360 _d134360 |
||